格式:pdf
大小:9KB
頁數(shù): 5頁
三軸攪拌樁工法施工工藝 : Three axial mixing pile method as the foundation pit retaining and waterproof curtain is a kind of technology, in Shanghai, Tianjin, Nanjing three has been gradually accepted by the engineering and technical personnel, and has made the mature experience of many applications, it is to promote the country, currently in Tianjin Bay Plaza Project in Tianjin city by using three axis
國外最新施工,工法工藝知識來自于造價通云知平臺上百萬用戶的經(jīng)驗與心得交流。 注冊登錄 造價通即可以了解到相關(guān)國外最新施工,工法工藝最新的精華知識、熱門知識、相關(guān)問答、行業(yè)資訊及精品資料下載。同時,造價通還為您提供材價查詢、測算、詢價、云造價等建設(shè)行業(yè)領(lǐng)域優(yōu)質(zhì)服務(wù)。手機(jī)版訪問:國外最新施工,工法工藝