格式:pdf
大?。?span class="single-tag-height">574KB
頁數(shù): 56頁
Manipulator i s now used a s a industrial r obots in use, the contr ol objective s often a ppe ar often i n industrial a utomation. Industrial a utomation technology has gradually matured, as mature a te chnol ogy line has bee n rapi d devel opme nt in i ndustrial aut omation a s a se parate subje ct. Ma nipulator appli cation bega n to filter into weldi ng, l ogistics, mechani cal pr oce ssing, a
格式:pdf
大?。?span class="single-tag-height">107KB
頁數(shù): 11頁
3.5 工程量的計算 3.5.1 基礎(chǔ)工程 A 場地平整: S平整=54.84×72.64-32×34 =2223.533 m 2 套定額: 1000 m 2 /1.27 工日 勞動量: 2223.533÷1000÷1.27=1.75 工日 B 土方開挖 本工程基礎(chǔ)埋深為 2.3m,墊層厚度 0.1m,設(shè)計室外地坪 -0.6m,則開挖深度 為:2.3-0.6+0.1=1.8m 〉1.5m,故開挖時需要放坡。 基礎(chǔ)挖方工程量: J-1 V= (6.76+11.44+19.36 )×1.8÷3=24.52 3m J-2 V= (6.25+10.75+18.49 )×1.8÷3=23.19 3m J-3 V= (7.29+14.85+20.25 )×1.8÷3=25.89 3m J-4 V= (3.61+7.03+13.69 )×1.8÷3=16.01 3m J-5 V= 6.76 ×5.6×
10000專項地質(zhì)調(diào)查知識來自于造價通云知平臺上百萬用戶的經(jīng)驗與心得交流。 注冊登錄 造價通即可以了解到相關(guān)10000專項地質(zhì)調(diào)查最新的精華知識、熱門知識、相關(guān)問答、行業(yè)資訊及精品資料下載。同時,造價通還為您提供材價查詢、測算、詢價、云造價等建設(shè)行業(yè)領(lǐng)域優(yōu)質(zhì)服務(wù)。手機版訪問:10000專項地質(zhì)調(diào)查