造價(jià)通
更新時(shí)間:2025.01.05
工程造價(jià)與管理論文英文文獻(xiàn)中英對(duì)照

格式:pdf

大?。?span class="single-tag-height">25KB

頁(yè)數(shù): 5頁(yè)

英文文獻(xiàn) Engineering cost management Project cost control emphasis should be transferred to the project construction early days, is transferred to the project decision and design stage. Project cost control in construction projects throughout the entire process, the key lies in the pre construction investment decision-making with design phase, whereas in the investment decision is made, the key l

環(huán)境工程英文文獻(xiàn)附帶帶翻譯 (2)

格式:pdf

大小:194KB

頁(yè)數(shù): 17頁(yè)

Environmental problems caused by Istanbul subway excavation and suggestions for remediation Ibrahim Ocak Abstract: Many environmental problems caused by subway excavations have inevitably become an important point in city life. These problems can be categorized as transporting and stocking of excavated material, traf?c jams, noise, vibrations, piles of dust mud and lack of supplies. Althou

熱門(mén)知識(shí)

工程造價(jià)相關(guān)的英文文獻(xiàn)

精華知識(shí)

工程造價(jià)相關(guān)的英文文獻(xiàn)

最新知識(shí)

工程造價(jià)相關(guān)的英文文獻(xiàn)
點(diǎn)擊加載更多>>

相關(guān)問(wèn)答

工程造價(jià)相關(guān)的英文文獻(xiàn)
點(diǎn)擊加載更多>>
專(zhuān)題概述
相關(guān)資訊
工程造價(jià)相關(guān)的英文文獻(xiàn)相關(guān)專(zhuān)題

分類(lèi)檢索: